[Bosnia and Herzegovina high-speed construction begins] The Br č ko Bijelina Expressway in Bosnia and Herzegovina, jointly constructed by China Overseas Engineering Co., Ltd. and China Railway Fourth Bureau, has recently started construction, with a total length of 17 kilometers and a construction period of 3 years. This section is a key link of the high-speed network connecting Banja Luka, the capital of the Serbian Republic of Bosnia and Herzegovina, and Belgrade, the capital of Serbia. It is also another landing project of China Poland the Belt and Road cooperation and infrastructure interconnection under the framework of China Central and Eastern Europe. Editor/Cheng Liting
Click to see more live >>
Latest
  • 2026.07.01 09:57
  • [Romania's 700MWh energy storage has been finalized]
  • Romanian power giant Electrica announced that it has obtained 17 grid connected energy storage projects with a total capacity of 700MWh. China's energy storage industry chain welcomes new opportunities for going global.Editor/Gao Xue
  • 2026.07.01 09:55
  • [China firmly ranks in the top tier of clean energy]
  • On June 24, 2026, at the Clean Energy Chain Conference of the Chain Expo, it was pointed out that China's energy industry has steadily ranked among the top tier of global clean energy, and the supporting facilities and equipment of the entire chain have achieved phased results.Editor/Gao Xue
Share

Retrieve password

Get verification code
Sure