Hydroproject
Anhui Huainan General Flood Storage Area Construction Project Fully Commences
Seetao 2023-06-29 10:35
  • The total investment of the flood storage project is about 1.758 billion yuan, with a total construction period of 24 months
  • The construction content includes strengthening the embankment by 111.26 kilometers, constructing the embankment top road and the upper embankment road by 125.42 kilometers
Reading this article requires
6 Minute

On June 28, 2023, the construction project of the general flood storage area in the Huaihe River basin of Anhui Province will be started at Sunmiao Baozhuang Weir, Xiejiaji District, Huainan City, with a total investment of about 1.758 billion yuan.

The construction project of the general flood storage area in the Huaihe River Basin in Anhui Province is one of the 172 major water conservation and water supply projects determined by the State Council, and also one of the key projects in the "Implementation Plan for Further Harnessing the Huaihe River". The project involves 4 depressions in 9 counties and districts, including Huainan, Hefei, Fuyang, and Suzhou in Anhui Province, with a governance area of 4722 square kilometers. The main tasks include rebuilding two water gates, strengthening embankments, constructing flood control roads at the top of embankments, dredging and excavating flood diversion ditches and drainage ditches, constructing and rebuilding drainage stations and supporting culvert gate projects through embankments. After the completion of the project, the flood control and drainage capacity system of the Baozhuang embankment in the flood storage area will be further improved to ensure the safety of the lives and property of residents in the Baozhuang embankment. This is of great significance for improving the production and living conditions of the local people, ensuring national food security, assisting rural revitalization, and promoting high-quality social and economic development in the region.

It is understood that the project involves 4 general flood storage areas in 9 counties and districts of Huainan, Hefei, Fuyang, and Suzhou, Anhui Province. The main construction content includes reinforcement of 111.26 kilometers of embankments, construction of 125.42 kilometers of embankment top roads and upper embankment roads, etc. The estimated total investment of the project is 1.758 billion yuan, with a total construction period of 24 months.

The construction of general flood storage areas in the Huaihe River Basin in Anhui Province has started. After the completion of the project, it will further improve the flood control and drainage system of the Baozhuang embankment in the flood storage area, ensuring the safety of the lives and property of residents in the Baozhuang embankment. This is of great significance for improving the production and living conditions of the local people, ensuring national food security, assisting rural revitalization, and promoting high-quality regional economic and social development. Editor/Xie Li

Comment

Related articles

Hydroproject

Bidding for Liuyuan Reservoir Project in Shangli County, Jiangxi Province

03-05

Hydroproject

COVEC won the bid for the Abidjan Ajiamei rainwater and sewage diversion project

03-01

Hydroproject

Anhui Xin'anjiang River Basin Flood Control and Governance Project Starts

02-28

Hydroproject

Jiangxi International won the bid for the Namibia Water Supply Pipeline Project

02-22

Hydroproject

LOT3A section of urban flood control and improvement in Ibadan, Nigeria

02-19

Hydroproject

The Pearl River Delta Water Resources Allocation Project

02-04

Collect
Comment
Share

Retrieve password

Get verification code
Sure