Recently, SPCECC won the bid for the comprehensive utilization project of naphtha and light diesel oil of Shaanxi Yanchang China Coal Yulin Energy Chemical Co., Ltd., with a contract value of about 180 million yuan. Young diesel upgrading, 250,000 tons/year olefin raw material refining unit and general plan transportation, storage and transportation facilities, water supply and drainage systems, auxiliary production facilities, etc.
The project is located in Jingbian County Industrial Park, Yulin City, Shaanxi Province, with a total investment of 1.554 billion yuan. The construction scale includes a 200,000-ton/year heavy aromatics adsorption and separation unit, a light hydrocarbon cracking raw material advanced treatment unit (250,000 tons/year naphtha oil hydrofining, 200,000 tons/year diesel hydro-upgrading, 250,000 tons/year olefin raw material refining) and other unit units, tank farms and other supporting projects are planned to be completed by the end of May 2024.
In order to ensure the construction of the project, after signing the construction general contract, SPCECC will set up a project manager department, scientifically organize and make reasonable arrangements, and give full play to the team style of "strict, meticulous, fast, hard-working, united and dedicated, good at fighting tough battles" and implement the " With the quality awareness of high standards, strict requirements, refinement, and zero defects, we will go all out to ensure high quality and high standards to complete this general contracting task on schedule.
It is reported that the company has also successfully signed the PC general contract for the project's 200,000 tons/year heavy aromatics adsorption and separation unit device, the contracting scope includes 200,000 tons/year Residual liquid tower system, extracted liquid tower system, heating furnace system and related public engineering systems. At present, various construction tasks of the device are progressing in an orderly manner. Editor / Zhao E
Comment
Write something~