Construction
How is an offshore wind farm built in a minute
Seetao 2023-06-14 14:33
  • The global offshore wind industry will grow seven-fold by 2032 and account for 26% of total installed capacity within the next 10 years
  • Over the next decade, China's annual capacity additions will average 80 gigawatts, accounting for half of global capacity additions
Reading this article requires
2 Minute

Countries around the world are seeking to accelerate the energy transition, and offshore wind power is moving forward at a high speed! How is an offshore wind farm built? How is it different from the construction of onshore wind? How did the 100-meter high sea blower do it? Give me a minute to take you through the construction process of Longyuan Power Offshore wind Farm, a national energy group.

Over the next 10 years, 30 countries will increase their offshore wind capacity, but European countries and China will still account for 81% of new offshore wind capacity installed globally. At the end of 2022, China once again topped the list as the country with the most new offshore wind capacity after overtaking the UK for the first time in 2021. Editor/Xu Shengpeng


Comment

Related articles

Construction

China's deepest underwater high-speed railway tunnel excavated to 113 meters underwater

04-09

Construction

Gansu Province implements the New Energy Plus Ten Actions

04-08

Construction

Visit the Congo (Kinshasa) Capital Ring Road Project

04-08

Construction

Construction of Gansu Zhejiang ultra-high voltage project begins

04-02

Construction

China opens high-speed railway underwater in the Yangtze River

03-31

Construction

12.13-meter giant crossing the Yangtze River, Wuhu GIL pipe gallery under construction

03-30

Collect
Comment
Share

Retrieve password

Get verification code
Sure