Wind power
Guangxi Tiandong 200MW Wind Power Project Approved
Seetao 2024-03-05 08:18
  • After the project is completed, it is expected to provide 400 million kilowatt hours of green electricity annually
Reading this article requires
3 Minute

Recently, the Tiandong Lianhuashan Naba Wind Farm 200MW project of Xinchang Power Generation Branch of State Power Investment Jiangxi Electric Power Co., Ltd. has been approved by the Development and Reform Commission of Baise City, marking a new chapter in the development of wind power in Guangxi.

The Tiandong Lianhuashan Naba wind farm project has an installed capacity of 200MW and is located in Tiandong County, Baise City, Guangxi Zhuang Autonomous Region, a revolutionary old area. The project is planned to start construction within 2024 and be fully connected to the grid by 2026.

After the completion of the project, it is expected to provide 400 million kilowatt hours of green electricity annually, save about 120500 tons of standard coal, reduce carbon dioxide emissions by about 3511000 tons, and reduce emissions of harmful substances such as smoke and dust by about 28.03 tons. This is of great significance for accelerating the development of local high-quality wind energy resources, ensuring safe and stable energy supply, and promoting local economic and social development.Editor/Zhao E


Comment

Related articles

Wind power

Grid connected power generation of centralized wind power projects in Bangladesh

03-18

Wind power

6.23 billion! Shanhaiguan Offshore Wind Power Phase I 500MW Project Approved

03-18

Wind power

Gansu Yumen 400000 kW Wind Power Project Starts

03-18

Wind power

CGN signs contract for Chongqing 250MW wind and solar energy storage project

03-17

Wind power

Mainstream Ireland signs contract for wind power project in the Philippines

03-15

Wind power

Jilin Songyuan 100MW Wind Power Project Approved

03-14

Collect
Comment
Share

Retrieve password

Get verification code
Sure